Long-lead equipment sets the schedule
Switchgear, cooling plant and power equipment are back-ordered across the industry. Projects wait in line for parts instead of building.

All-Prefabricated Modular AI Data CentersAxisOne designs, manufactures and delivers prefabricated modular AI data centers, with our own liquid cooling and power equipment inside, built turnkey as your EPC partner.
01 / The Challenge
GPUs ship in weeks. The infrastructure to house, cool and power them takes far longer. Every month a cluster waits on a building is revenue that never comes back.
Switchgear, cooling plant and power equipment are back-ordered across the industry. Projects wait in line for parts instead of building.
A typical build stitches together a dozen suppliers and contractors. Every interface is a place where scope, schedule and warranty slip.
Liquid-cooled AI racks now run well past 100 kW. Facilities designed for enterprise IT cannot carry that heat or that electrical load.
AxisOne closes the gap with three self-developed foundations, power, cooling and control, built in our own factories and delivered turnkey.
How an AI campus comes together
Secure the megawatts. Onsite generation, MV and LV power modules, switchboards and battery backup.
Power Step 02Lay out the IT capacity. All-prefabricated data halls and support modules sized to your load and rack density.
Modular platform Step 03Match cooling to density. CDUs, chillers and dry coolers covering the full loop from cold plate to atmosphere.
Cooling products Step 04Build and energize. Design, prefab, test, ship, install and commission under one contract.
EPC capability02 / Power
Power decides where and how fast a campus gets built. AxisOne delivers every step from onsite generation and medium voltage down to the rack, factory integrated and tested.






03 / Modular Campus
Modular design, factory prefabrication, integrated assembly and pre-testing. Every module arrives wired, piped and tested, ready to set and connect.

Modular AI Data Center
Seven standard modules combine into a complete campus. Each is configurable to your site and scale.







04 / Liquid Cooling
A complete liquid-cooling matrix covering the full AI data center loop, from the cold plate to heat rejection, for precise thermal management of high-density racks.
Built for North AmericaFeatured product
A liquid-to-liquid coolant distribution unit that separates facility water from the IT loop, holds coolant conditions steady and gives operators continuous monitoring and alarms.



Distribution and heat rejection, engineered to work together. All units run on 480 V / 3 PH / 60 Hz with water, EG or PG coolant.




05 / Turnkey EPC
Beyond our own equipment, AxisOne's professional engineers deliver the campus end to end: design, prefab, test, ship, install and commission.
In-house R&D, design, structural and MEP teams, managed as one.
Self-developed equipment, centrally procured and fabricated in-house.
On-site execution by the same team that designed and built the modules.
Site-specific layout from standard modules
Fabricated and assembled in our factories
Factory inspection, aging and testing
Flat-rack and oversize routing, customs, protection
Receive, hoist, reconnect
Energize, test, start up
Why a single EPC matters
Self-developed, centrally procured, in-house fabricated and on-site executed. Prefabrication plus turnkey EPC means faster delivery, fewer surprises and a lower total cost of ownership.
06 / Speed to Power
Modules are built and tested in our factories while your site is prepared. Once they arrive, on-site installation takes 8 to 12 weeks.
We build our own modules, cooling and power equipment, so your schedule is not hostage to someone else's backlog.
Modules are pre-integrated and tested in the factory. Problems get solved on our floor, not on your site.
Plug-and-play modules mean less field labor, fewer trades and a short path from delivery to commissioning.

07 / The Company Behind It
people behind every AxisOne project.
Jereh AxisOne is backed by Jereh Group, a global energy equipment manufacturer with more than 9,000 employees across engineering, R&D, manufacturing and field service. That depth is why we can commit to schedules others cannot.
Modules, cooling and power equipment built in our own manufacturing bases.
Design, structural, MEP and controls teams, backed by one-stop management.
Decades of building heavy energy equipment for demanding operators worldwide.
U.S. office in Sunnyvale, California, and operations in Houston, Texas.
Houston, TexasGlobal footprint
A global production and delivery network with a home base in Houston.
08 / In the Field
From the switchgear room to the cooling plant, every system on site is designed and built by the same team.





09 / Our Core Advantages
Hyperscalers, neoclouds and developers choose AxisOne when the date matters as much as the design.
Built for high-density HPC clusters and liquid cooling from the start.
Factory-tuned modules, configured to your site and scale.
Factory pre-integrated and tested, then 8 to 12 weeks on site.
Phased scale-out with modular assets that can move when you do.
Lower CAPEX and OPEX for a lower full-life cost.
Secure core controls and our own power and cooling products, with no vendor lock-in.
10 / Start a Project
Share your site, load and target energization date. An AxisOne engineer will come back with a modular layout, a delivery path and a schedule you can plan around.